Year |
Project |
Spec |
2020 |
Pallet |
DL3a – WIP |
2020 |
Pallet |
MQ4a – Shipping |
2020 |
Pallet |
IS-05 |
2020 |
Parts Loading Table |
Transfer Line |
2019 |
Lifting Ball Transfer |
Tandom, Transfer Line |
2019 |
Pallet |
DN8a Hot Stamping – Shipping |
2019 |
Provide Embed |
Structure Material |
2019 |
Installation Mezzanine |
6,150sqft |
2019 |
Scrap Conveyor |
Main Line – 2, Sub Line -1 |
2019 |
Pit Cover |
T/F Line |
2019 |
Pallet |
DL3a – Shipping |
2019 |
Utility Piping |
DL3a Assembly Line – Water, Cooler, Gas |
2019 |
Pallet |
ON – Shipping |
2018 |
Inspection Table |
Q/C Inspection |
2018 |
Blanking Storage Rack |
Blanking Line |
2018 |
Safety Fence |
2,000H x 30,000L |
2018 |
Launch Containment Station |
Q/C Inspection |
2018 |
By-pass Conveyor |
Tandom Line |
2018 |
Evalustion Table |
Q/C Jig Handling |
2018 |
Utility Piping |
CMM Room |
2018 |
Pallet |
IS-05, IS-22 |
2018 |
Feeder Belt Conveyor |
Blanking Line |
2018 |
Finger Arm Loading Hanger |
Tandom, Transfer Line |
2017 |
Scrap Conveyor |
Main Double Line(1200W) – 4 Line 260M, Sub Line(800W) -3 Line 150M |
2017 |
Utility Piping |
Chiller In/Out, Compressor Air : 6” x 1,500Ft |
2017 |
Press / Trench Cover |
Blanking, Tandom, Transfer Line |
2017 |
Chip Conveyor |
300W |
2017 |
Pallet |
TMA Hot Stamping – Shipping |
2017 |
Replace Scrap Conveyor |
Main Line(1500W) – 2, Shuttle Conveyor |
2017 |
Press Die Rack |
3 Story, Drawer Type |
2017 |
Idle Jig |
Tandom Line |
2017 |
Bale Conveyor Repair |
Press Shop |
2017 |
Coil Rack |
Press Shop |